Thursday 22 September 2011

This site will be updated on 30 September 2011


 

 



Search WWW
Search Paarlpost

 


New sewage works planned

New sewage works planned
 
2005-11-03


THE sewage infrastructure of Paarl and Wellington needs to be upgraded urgently due to urban development.

In the short term the Municipality plans to link the Wellington sewage works with the Paarl sewage works via a pipeline.

Not only must the Paarl sewage works itself be enlarged by 33%, but an additional bulk gravity pipeline will have to be built from Paarl South to increase capacity.

In the long term (by 2024) an additional sewage works will have to be developed due to the residential expansion of Paarl in a southerly direction.

Consultants have been appointed to identify and proclaim the terrain for a new regional sewage works for the rural area south of the N1.

Sites which are under consideration include Drakenstein Prison (next to the existing sewage works at the prison), near the Berg River in the vicinity of Paarl Brickfields, and on Parys farm (next to the Paarl Arboretum).

To register as an interested or affected party, contact Nicol Zimmermann or Andrew Spinks of Ninham Shand at tel 481-2400 or enviro@shands. co.za.



More News
  • Manager did much good work
  • Zandwyk Park goes ahead
  • Rare wines hold their own at auction
  • Multiple awards for Grande Provence
  • Grondkundige kragte saamgespan
  • Fairtrade vloei suiwer by Bosmans
  • Sweet success for Nederburg
  • “TERROIRIST” at Nederburg Auction
  •  
        [ Top ] Tel: (021) 870-4600    email: edit@paarlpost.co.za